JEROMESVILLE (4/15/21)--In these photographs, the continued progress to the front of the building and elementary wing can be seen. Both elevator shafts are almost blocked in and the elementary gym walls have had additional block work added.
Most of the footers in the grade 7-12 wing have been poured, so soon the entire educational part of the building will be formed.
At the stadium, the goal posts have been set and the long jump runway and pit are in place.
The photographs showing the dirt work is at the baseball/softball complex. Most of the dirt work pictured is the leveling of the second baseball field.